CONTRACT NO: SD 15/2022
Outlying
Island Sewerage Stage 2 – South Lantau Sewage Works – Environmental Team Services (2023
– 2024) Under Environmental Permit no. EP-538/2017
annual Environmental Monitoring & Audit review Report
November 2022 to October 2023
Revision 2
|
|
CLIENTS: |
|
|
Drainage Services Department |
Lam Environmental Services Limited 19/F Remex Centre, 42 Wong Chuk Hang Road, Hong Kong Telephone:
(852) 2882-3939 Facsimile:
(852) 2882-3331 E-mail:
info@lamenviro.com Website:
http://www.lamenviro.com |
|
|
|
|
|
|
|
|
Certified
by: |
|
|
_______________________________ Environmental
Team Leader Derek
Lo |
|
|
DATE: |
|
|
28 August 2024 |
|
|
|
1.1.......... Scope of the Report
1.2.......... Structure of the Report
2.1.......... Project Organization
and Key Contact Personnel
2.2.......... Construction Programme
3. A Brief Summary of EM&A
Requirements
3.1.......... Monitoring Parameters
3.2.......... Environmental Quality
Performance Limits
4.2.......... Environmental
Mitigation Measures
5. Monitoring Results Analysis
5.1.......... Noise Monitoring
5.2.......... Water Quality
Monitoring
5.3 Ecological Impact Monitoring……………………………………………..
5.4.......... Waste Management
6. Complaints, Notification of Summons
and Prosecution
7. Comments and Recommendations
lIST
OF TABLES
Table 2.1 Contact
Details of Key Personnel
Table 2.2 Summary of submission status under
EP-538/2017
Table 2.3 Summary of the current status on licences
and/or permits on environmental
protection pertinent to the
Project
Table 3.1 Action and Limit Levels for Construction
Noise Impact Monitoring
Table 3.2 Action
and Limit Levels of Water Quality
Table 4.1 Summary of Environmental Inspections
Table 4.2 Summary
of Ecological Impact Monitoring
Table 5.2 The number of water quality monitoring carried out in each month
during the reporting period
(November 2022 to October 2023)
Table 5.3 The number of water quality exceedances in each month during the
reporting period (November 2022 to October 2023)
Table 5.4 Summary of Quantities of Waste Material (November 2022 to October 2023)
Table 6.1 Summary of Complaints in the Reporting Period
Table 6.2 Cumulative
Statistics on Complaints
Table 6.3 Cumulative
Statistics on Successful Prosecutions
lIST OF FIGUREs
Figure 2.1 Project Organization Chart
Figure 2.3
Contract Layout Plan
Figure 3.1 Original location of Aquilaris sinensis
Figure
3.2 Temporary Holding Nursery
Figure
5.1 Locations of Noise Monitoring
Station
Figure
5.2 Locations of Water Quality Monitoring Stations
lIST OF APPENDIces
Appendix
5.1 Annual Summary Waste Flow Table
Appendix
5.2 Noise Monitoring Results and
Graphical Presentations
Appendix
5.3 Marine Water Quality Monitoring
Results and Graphical Presentations
Appendix 7.1 Environmental Mitigation Measures Implementation Status
EXECUTIVE SUMMARY
i.
This
is the Second Annual Environmental
Monitoring and Audit (EM&A) Review Report – November
2022 to October 2023 of Outlying
Islands Sewerage Stage 2 – South Lantau Sewerage Works under Environmental
Permit no. EP-538/2017 (Hereafter as “the Project”). The construction works of the Project was
commenced on 3 November 2021 and the tentative completion date is Q1 2026. The Annual EM&A Review Report presents
the environmental monitoring findings and information recorded during the
period of 1 November 2022 to 31 October 2023.
ii.
In
the reporting period, the principal work activities conducted are as follow:
·
Ground Excavation, sewer laying, construction of manhole at Pui O Lo Uk
Tsuen, South Lantau road, Pui O Beach
·
Excavation and site formation at San Shek Wan Sewage Treatment Works
(SSWSTW) and Pui O Sewage Pumping Station (POSPS)
·
HDD works at marine and SSWSTW
·
ELS works at POSPS
·
Removal works of Excavation and Lateral Support (ELS)
·
Superstructure Reinforced Concrete (RC) Works
Exceedances of Action/Limit Levels
Noise Monitoring
iii.
Noise monitoring was conducted at eight (8) noise monitoring stations (N12a,
N12b, N13, N14, N15b, N16a, N16b and N17) once per week in the reporting
period.
iv.
School examination was taken place at N17 – Bui O Public School from 14 to 16 November 2022, 27 to 28 February 2023, 1 March 2023
and 12 to 14 June 2023 in the reporting period, the limit level shall be
adjusted to 65dB(A) during this period.
v.
No action and limit level exceedances were recorded in construction
noise level in the reporting period.
Water Quality Monitoring
vii.
Water quality monitoring (WQM) on 1, 3 and 5 Nov 2022, 16 and 28 Jan
2023, 22 and 27 Feb 2023, 27 Mar 2023, 22 Apr, 17 Jul 2023, 1 and 8 Sep 2023, 7,
9 and 18 Oct 2023 were cancelled due to adverse weather. No substitution would
be arranged for such cancellation since it is impossible to maintain the
monitoring frequency as three times a week for the event of marine water
quality monitoring cancellation in between time with respect to the fact that
not less than 36 hours interval shall be followed for two monitoring days as
required by the EM&A Manual Clause 5.1.6 (b) for the project.
viii.
In accordance with the action level and limit level in Baseline
Monitoring Report Rev. 9.2 agreed by EPD on 2 September 2022, 6 action level
exceedances on turbidity, 16 action level exceedances on SS were recorded in
the reporting period of 1 November
2022 to 31 October 2023.
Ecological Impact Monitoring
ix.
Transplanting works for plant species, Aquilaris sinensis, was completed on 26 April 2022. Maintenance
works for trees in holding nursery have commenced.
x.
As per latest version of PTP, four tree found (1 no. of Aquilaria sinensis and 3 nos. of Gmelina chinensis) within the site of
SSWSTW which are considered to be the plant species with conservative
importance for temporarily transplanted to the nursery at Kam Tin and
eventually be transplanted to Pui O Pumping Station.
xi.
The weekly
site audit was carried out by ET include checking whether good site practices
are being properly implemented by the Contractor. No unacceptable construction
activities impact to the surrounding transplanted trees has been found in the
reporting period of 1 November 2022 to 31 October 2023, hence, the temporary
transplantation of the plant species with conservative importance is considered
effective.
xii.
The extent of the work site boundaries was checked by the ET during the
weekly site audit.
xiii.
The retained tree (T035) Dalbergia
assamica (南嶺黃檀) located within the site boundary of
the Construction of San Shek Wan Sewage Treatment Works was collapsed on 2 Sep
2023 afternoon after typhoon “Saola” (Signal No. 10). No injury and significant
damage were caused in the tree collapse incident. Incident report for this case
was provided by the Contractor on 11 October 2023. To minimize obstruction to
the public, the collapsed tree has been removed and delivered to Y Park.
Complaint log
Notifications
of Any Summons and Successful Prosecutions
xv.
No environmental notification of any summons and
successful prosecution regarding the construction works was recorded in present quarter.
1.1.1.
Lam Environmental Services Limited (LES) has been appointed to work as
the Environmental Team (ET) under Environmental Permit (EP) no. EP-538/2017 to
implement the Environmental Monitoring and Audit (EM&A) programme as
stipulated in the EM&A Manual of the approved Environmental Impact
Assessment (EIA) Report for Outlying Islands Sewerage Stage 2 - South Lantau
Sewerage Works (Register No.: AEIAR-210/2017).
1.1.2.
The Annual EM&A Review Report was prepared according to Section 12.4
of the Project EM&A Manual.
Section 1 Introduction – details the scope and structure of the report
Section 2 Basic
Project Information – a synopsis of project
organization, programme contacts of key management, and a synopsis of work undertaken
in the reporting period.
Section 3 A
Brief Summary of EM&A requirements – including monitoring parameters, environmental quality
performance limits (Action and Limit levels); and environmental mitigation
measure, as recommended in the EIA Report.
Section 4 Implementation
Status – Advice on the implementation
status of environmental protection and pollution control/mitigation measures,
as recommended in the EIA Report and summarised in the updated implementation
schedule.
Section 5 Monitoring
Results Analysis – the trends of the
monitoring parameters in present quarter; advice on the solid and liquid waste
management status.
Section 6 Summary
of Non-Compliance (exceedances) of the environmental quality performance
limits, Complaints,
Notification of Summons and Successful Prosecutions
A
brief review of the reasons for and the implications of non-compliance and a
summary description of the actions taken and any follow-up procedures related
to earlier non-compliance.
A summary record
of all complaints received (written or verbal) for each media, liaison and
consultation undertaken, actions and follow-up procedures taken;
A summary record of notifications
of summons and successful prosecutions for breaches of the current
environmental protection/pollution control legislations, including locations
and nature of the breaches, investigation, follow-up actions taken and results.
Section 7 Comments and Recommendations – such as effectiveness and efficiency of the mitigation
measures, improvement in the EM&A programme, if any.
Section 8 Conclusion
and Project Proponent’s contacts and hotline telephone number for the public to
make enquiries
2.1.1
Drainage Services Department is the overall project controllers for the
Project. For the construction phase of the Project, Contractor(s),
Environmental Team and Independent Environmental Checker are appointed to
manage and control environmental issues. Key personnel and contact particulars are
summarised in Figure 2.1 and Table 2.1:
Table 2.1 Contact Details of Key Personnel
|
Party |
Role |
Post |
Name |
Contact
No. |
Contact
Fax |
|
Drainage
Services Department (DSD) |
The Engineer for the
Contract |
Engineer |
Mr. Silas Chan |
2594 7272 |
3104 6426 |
|
Binnies
Hong Kong Limited |
Engineer’s
Representative |
Resident
Engineer |
Mr. Clayton Lei Mr. Kevin Chan * |
3529 3013 |
- |
|
Kwan
Lee – Chun Wo Joint Venture |
Contractor
|
Site
Agent |
Mr. Charles Tse |
9270 3384 |
2744 6937 |
|
Environmental
Officer |
Ms. Shirley Kong |
5162 5933 |
|||
|
SMEC Hong Kong |
Independent Environmental
Checker (IEC) |
Independent Environmental Checker (IEC) |
Ms. Kitty Lee |
3995 8140 |
3995 8101 |
|
Environmental Team (ET) |
Environmental Team Leader (ETL) |
Mr. Derek Lo |
2882 3939 |
2882 3331 |
|
|
Hotline telephone number for the public to make enquiries: |
5560 8961 |
||||
Notes:
* Engineer’s
Representative change from Mr. Clayton Lei to Mr. Kevin Chan start from 1 March
2023
2.2.1 The proposed sewerage works will collect the sewage generated from the unsewered areas of Shui Hau, Tong Fuk, Cheung Sha, San Shek Wan, Pui O and Ham Tin in South Lantau (i.e. within the Project Catchment Area) and convey it to a proposed sewage treatment works at San Shek Wan for treatment and disposal into outer bay of Pui O/ Chi Ma Wan via a submarine outfall.
2.2.2 The entire Project are divided into three contracts. Contract No. DC/2020/20 (the Contract) would have the following implementations as demonstrated in Figure 2.2.
2.2.3 The major components of the Project under Environmental Permit (EP) (EP No. EP-538/2017) comprises: (i) construction of sewage treatment works at San Shek Wan (SSWSTW) and associated submarine outfall; (ii) construction of sewage pumping station at Pui O (POSPS); (iii) village sewage works at Pui O; and (iv) trunk sewers and rising mains on carriageways.
2.2.4 The Location of works are shown in Figure 2.3.
2.3.1
A summary of the current status on submissions and measures mentioned in
Environmental Permit (EP-538/2017) are shown in Table 2.2.
Table 2.2 Summary of submission status under EP-538/2017
|
EP
Condition |
Submission |
Date of
Latest Submission to EPD^ / EPD Approval# |
|
Condition 2.10 |
Waste Management Plan (Rev. 5) (electronic copy) |
4 April 2022# |
|
Condition 2.11 |
Submission of Preservation and/or Transplantation
Plan for Plant Species of Conservation Importance (Rev. 23) |
9 September 2022# |
|
Condition 2.12 |
Submission of Compensatory Woodland Planting Plan
(Rev. 23) |
15 May 2023^ |
|
Condition 2.13 |
Silt Curtain Deployment Plan (Rev. 11) |
1 June 2022# |
|
Condition 2.14 |
Landscape Mitigation Plan |
To be confirmed |
|
Condition 2.15 |
Construction Noise Mitigation Plan (Rev. 20) |
4 August 2022# |
2.3.2
A summary of the current status on licences and/or permits on
environmental protection pertinent to the Project is shown in Table 2.3.
|
Permits and/or Licences |
Permit. No. / Account No. |
Issued Date |
Valid Period & Expiry Date |
Status |
|
Notification
of Works Under APCO |
466408 |
14 Apr
2021 |
N/A |
Valid |
|
Wastewater
Discharge Licence
under Water Pollution
Control Ordinance |
POPS: WT00039820-2021 |
31 Dec
2021 |
31-12-2021
to 31-12-2026 |
Valid |
|
SSWSTW: WT00039636-2021 |
30 Dec
2021 |
30-12-2021
to 31-12-2026 |
Valid |
|
|
SSWSTW:
Gravity Sewer
& Raising Main: WT00042613-2022 |
9 Jan
2023 |
09-01-2023
to 31-01-2028 |
Valid |
|
|
Billing
account under Waste Disposal Ordinance |
Account
No.: 7040411 |
05 May
2021 |
N/A |
Valid |
|
Registration
as a Chemical Waste Producer |
0000-931-K3428-01 |
13 May
2021 |
N/A |
Valid |
|
Construction
Noise Permit under Noise Control Ordinance for SSWSTW |
GW-RS0642-22 |
3 Aug 2022 |
05-08-2022 to 02-02-2023 |
expired in the reporting period |
|
GW-RS0039-23 |
20 Jan 2023 |
03-02-2023 to 02-08-2023 |
expired in the reporting period |
|
|
GW-RS0657-23 |
9 Aug 2023 |
11-08-2023 to 08-02-2024 |
Valid |
|
|
Construction
Noise Permit under Noise Control Ordinance for POSPS |
GW-RS0840-22 |
3 Oct
2022 |
05-10-2022
to 26-03-2023 |
expired
in the reporting period |
|
GW-RS0230-23 |
7 Mar
2023 |
27-03-2023
to 26-09-2023 |
expired
in the reporting period |
|
|
GW-RS0822-23 |
25 Sep
2023 |
27-09-2023
to 26-03-2024 |
Valid |
|
|
Marine Dumping Permit (Dredged Sediment Requiring
Type 1 – Open Sea Disposal |
EP/MD/23-117 |
16 Oct 2023 |
17-10-2023 to 15-11-2023 |
expired
in the reporting period |
Note: Only include those valid or
under application; fill in “N/A” for non-applicable item(s).
Noise
Monitoring
3.1.1 The construction noise level shall
be measured in terms of the A-weighted equivalent continuous sound pressure
level (Leq). Leq (30min) should be used as the monitoring
parameter. Supplementary information for data auditing, statistical results
such as L10 and L90 shall also be obtained for reference.
3.1.2 For impact monitoring for
construction of village sewers / rising main, noise monitoring should be
undertaken on weekly basis. One set of Leq
(30min) noise level as six consecutive Leq (5min) between
07:00-19:00 hours on normal weekdays.
Water Quality Monitoring
3.1.3 In construction phase, the levels
of dissolved oxygen (DO) (mg/L), temperature (°C), turbidity (NTU), salinity (ppt) and pH (units)
should be measured in-situ while
suspended solids (SS) (mg/L) is determined by laboratory analysis.
Ecological Impact Monitoring
3.1.4 Monitoring in the form of regular
site inspections should be carried out to ensure ecological measures in the
form of tree transplantation and establishment are being implemented and
effective for plant species of conservation importance (e.g. Aquilaria sinensis).
Noise
Monitoring
3.2.1 Noise monitoring is evaluated against
Action and Limit Levels. The action and limit levels for construction noise are
defined in Table 3.1 below.
Table 3.1 Action and Limit Levels
for Construction Noise Impact Monitoring
|
Time
Period |
Action
Level(a) |
Limit
Level |
|
07:00 –
19:00 hours on normal weekdays |
When one documented complaint is received from any one of the noise
sensitive receivers or 75 dB(A) recorded at the monitoring station |
·
70 db(A)
for school and ·
65
db(A) during examination period |
|
Notes: (a) Limits specified in the GW-TM and
IND-TM for construction and operational noise, respectively. |
||
Water
Quality Monitoring
3.2.2 Marine-based construction works had been
commenced since 19 April 2022, marine water quality monitoring was initialised
since 12 April 2022.
3.2.3
Water quality monitoring is evaluated against Action and Limit Levels.
The derived Action and Limit Level proposed in Baseline Monitoring Report Rev.
9.2 was agreed by EPD on 2 September 2022. Action and Limit Levels of marine
water quality monitoring have been set with reference to the derived criteria
as shown in Table 3.2 below.
Table 3.2 Action and Limit
Levels of Water Quality
|
Parameters |
Action
Level |
Limit
Level |
|
Construction Phase Marine Water
Monitoring - derived criteria |
||
|
DO in mg/L B |
Surface and
Middle: 5.8 mg/L Bottom: 5.9 mg/L |
Surface and
Middle: 4 mg/L Bottom: 2 mg/L |
|
Turbidity in NTU (Depth-averaged A) C |
14.4 NTU and 20% exceedance of
value at any impact station compared with corresponding data from control
station D |
23.5 NTU and 30% exceedance of
value at any impact station compared with corresponding data from control
station D |
|
SS in mg/L (Depth-averaged A) C |
13.1 mg/L and 20% exceedance of
value at any impact station compared with corresponding data from control
station D |
30.4 mg/L and 30% exceedance of
value at any impact station compared with corresponding data from control
station D |
Notes
(with proposed amendments in AL/LL in underlined text):
A. “Depth-averaged”
is calculated by taking the arithmetic means of reading of all three depths.
B. For
DO, non-compliance of the water quality limits occurs when monitoring result is
lower than the limits.
C.
For SS and turbidity, non-compliance of the water quality limits occurs when
monitoring result is higher than the limits.
D.
Action Level and Limit Level with 95%-ile / 99%-ile derived from baseline data
“and” 20% / 30% exceedance of control station proposed in Baseline
Monitoring Report.
Ecological monitoring
3.2.4 Transplanting works for plant species, Aquilaris sinensis, was completed on 26
April 2022. Maintenance works for trees in holding nursery have commenced.
3.2.5 Monitoring of maintenance works for the
transplanted plant species was conducted at the holding nursery while in the
reporting period.
3.2.6
As per latest version of PTP, four tree found (1 no. of Aquilaria sinensis and 3 nos. of Gmelina chinensis) within the site of
SSWSTW (Figure 3.1) which are considered to be the plant species with
conservative importance for temporarily transplanted to the nursery (Figure
3.2) at Kam Tin and eventually be transplanted to Pui O Pumping
Station.
3.2.7
The retained tree (T035) Dalbergia
assamica (南嶺黃檀) located within the site boundary of the Construction of San Shek Wan
Sewage Treatment Works was collapsed on 2 Sep 2023 afternoon after typhoon
“Saola” (Signal No. 10). No injury and significant damage were caused in the
tree collapse incident. Incident report for this case was provided by the
Contractor on 11 October 2023. To minimize obstruction to the public, the
collapsed tree has been removed and delivered to Y Park.
Table 4.1 Summary of Environmental Inspections
|
Inspection Period |
Date of Inspection |
Nos. of Findings |
Follow-Up Status |
|
November 2022 |
1, 8, 14, 22, 22 and 29 Nov 2022 |
9 |
Completed |
|
December 2022 |
6, 12, 13,19 and 28 Dec 2022 |
7 |
Completed |
|
January 2023 |
3, 6, 10,16, 26 and 31 Jan 2023 |
8 |
Completed |
|
February 2023 |
7, 13, 21 and 28 February 2023 |
3 |
Completed |
|
March 2023 |
8, 14, 20 and 28 March 2023 |
8 |
Completed |
|
April 2023 |
4, 11, 17 and 25 Apr 2023 |
6 |
Completed |
|
May 2023 |
2, 9, 15, 23 and 30 May 2023 |
3 |
Completed |
|
June 2023 |
6, 13, 19 and 27 June 2023 |
4 |
Completed |
|
July 2023 |
4, 11, 19 and 25 July 2023 |
4 |
Completed |
|
August 2023 |
1, 8, 15, 21 and 29 August 2023 |
5 |
Completed |
|
September 2023 |
5, 12, 18 and 26 September 2023 |
7 |
Completed |
|
October 2023 |
3, 13, 16 ,25 and 31 October 2023 |
3 |
Completed |
Table 4.2 Summary of Ecological Impact Monitoring
|
Inspection Period |
Date of Inspection |
Nos. of Findings |
Follow-Up Status |
|
November 2022 |
14 Nov 2022 |
2 |
Completed |
|
December 2022 |
12 December 2022 |
2 |
Completed |
|
January 2023 |
6 Jan 2023 |
4 |
Completed |
|
February 2023 |
6 Feb 2023 |
1 |
Completed |
|
March 2023 |
7 Mar 2023 |
2 |
Completed |
|
April 2023 |
17 Apr 2022 |
4 |
Completed |
|
May 2023 |
11 May 2023 |
1 |
Completed |
|
June 2023 |
20 Jun 2023 |
2 |
Completed |
|
July 2023 |
20 Jul 2023 |
2 |
Completed |
|
August 2023 |
24 Aug 2023 |
1 |
Completed |
|
September 2023 |
21 Sep 2023 |
1 |
Completed |
|
October 2023 |
25 October |
2 |
Completed |
5.1.1
Noise monitoring was conducted at eight (8) noise monitoring stations
(N12a, N12b, N13, N14, N15b, N16a, N16b and N17) once per week in the reporting
period.
5.1.2
School examination was taken place at N17 – Bui O Public School from 14
to 16 November 2022, 27 to 28 February 2023, 1 March 2023 and 12 to 14 June
2023 in the reporting period, the limit level shall be adjusted to 65dB(A)
during this period.
5.1.4
In the reporting period, the major work activities undertaken are as
follows:
·
Ground Excavation, sewer laying, construction of manhole at Pui O Lo Uk
Tsuen, South Lantau road, Pui O Beach
·
Excavation and site formation at San Shek Wan Sewage Treatment Works
(SSWSTW) and Pui O Sewage Pumping Station (POSPS)
·
HDD works at marine and SSWSTW
·
ELS works at POSPS
·
Removal works of Excavation and Lateral Support (ELS)
·
Superstructure Reinforced Concrete (RC) Works
5.1.5
In the reporting period, total 416 of impact noise monitoring at
proposed locations were carried out by the Environmental Team (ET). Detailed noise
monitoring results
measured in this reporting period are reviewed and summarized. Details of noise
monitoring results and graphical presentation can be referred in Appendix
5.2. The number of noise monitoring carried out in each month during the
reporting period are shown in Table 5.1 below,
Table 5.1 The
number of noise monitoring carried out in each month during the reporting
period (November 2022 to October 2023)
|
Reporting Month |
No. of Noise Monitoring |
|
November 2022 |
40 |
|
December 2022 |
32 |
|
January 2023 |
40 |
|
February 2023 |
40 |
|
March 2023 |
40 |
|
April 2023 |
32 |
|
May 2023 |
32 |
|
June 2023 |
40 |
|
July 2023 |
32 |
|
August 2023 |
40 |
|
September 2023 |
32 |
|
October 2023 |
32 |
5.1.6
No action and limit level exceedances were recorded
in construction noise level in the reporting period.
5.2.1
Marine Water quality monitoring involves nine (9)
monitoring stations (seven impact & two control stations) three days per
week in the reporting period starting from 12 April 2022.
Table 5.2 The number of water quality monitoring
carried out in each month during the reporting period (November 2022 to October 2023)
|
Reporting
Month |
No. of Water
Quality Monitoring |
||
|
|
Ebb |
Flood |
Total |
|
November 2022 |
99 |
99 |
198 |
|
December 2022 |
117 |
117 |
234 |
|
January 2023 |
90 |
90 |
180 |
|
February 2023 |
90 |
90 |
180 |
|
March 2023 |
117 |
117 |
234 |
|
April 2023 |
99 |
99 |
198 |
|
May 2023 |
126 |
126 |
252 |
|
June 2023 |
117 |
117 |
234 |
|
July 2023 |
108 |
108 |
216 |
|
August 2023 |
117 |
117 |
234 |
|
September 2023 |
99 |
99 |
198 |
|
October 2023 |
90 |
90 |
180 |
|
Total |
1269 |
1269 |
2538 |
Table 5.3 The number of water quality exceedances in
each month during the reporting period (November 2022 to October 2023)
|
|
|
Parameter |
DO (S&M) |
DO (Bottom) |
Turbidity |
SS |
Exceedance count |
|||||
|
Station |
Level exceeded |
Mid Ebb |
Mid Flood |
Mid Ebb |
Mid Flood |
Mid Ebb |
Mid Flood |
Mid Ebb |
Mid Flood |
Mid Ebb |
Mid Flood |
|
|
November 2022 |
Derived criteria in Baseline Monitoring Report Rev. 9.2 was agreed by
EPD on 2 September 2022 |
Action |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
1 |
0 |
1 |
|
Limit |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
||
|
December 2022 |
Action |
0 |
0 |
0 |
0 |
0 |
0 |
1 |
4 |
1 |
4 |
|
|
Limit |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
||
|
January 2023 |
Action |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
|
Limit |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
||
|
February 2023 |
Action |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
|
Limit |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
||
|
March 2023 |
Action |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
|
Limit |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
||
|
April 2023 |
Action |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
|
Limit |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
||
|
May 2023 |
Action |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
|
Limit |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
||
|
June 2023 |
Action |
0 |
0 |
0 |
0 |
0 |
0 |
1 |
0 |
1 |
0 |
|
|
Limit |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
||
|
July 2023 |
Action |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
|
Limit |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
||
|
August 2023 |
Action |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
1 |
0 |
1 |
|
|
Limit |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
||
|
September 2023 |
Action |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
|
Limit |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
||
|
October 2023 |
Action |
0 |
0 |
0 |
0 |
4 |
2 |
4 |
4 |
8 |
6 |
|
|
Limit |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
||
|
Total |
|
Action |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
22 |
|
|
|
|
Limit |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
5.1.5
For the exceedances recorded in October 2023, 3 action level exceedances
on turbidity and SS during ebb tide on 20 October 2023 were recorded; 2 action
level exceedances on turbidity and 4 action level exceedances on SS during
flood tide were recorded on 23 October 2023, 1 action level exceedances on
turbidity and SS during ebb tide was recorded on 23 October 2023. Co-related
the monitoring dates with those days with recorded marine works activities, no
marine dredging works were active during the reporting month. Smoothening works
within enclosed silt curtain on 20 October 2023. Higher turbidity was recorded
(>10 NTU) at all stations including control stations during ebb and flood
tide. No exceedances was recorded in the subsequent monitoring at these
stations on 23 Oct 2023, No marine works conducted on 23 October 2023. No
exceedances was recorded in the subsequent monitoring at these stations on 25
Oct 2023. Reviewed the overall work situation and the mitigation measures was
implemented by the Contractor, it can be concluded that the turbidity and SS
exceedances was possibly due to natural runoff from streams to the sea or
sudden change of water body.
5.2.1
Transplanting of the trees of Aquilaris sinensis was completed on 26 April 2022. Maintenance
works for trees in holding nursery have commenced.
5.3.1
The quantities of waste for disposal in present
period are summarized in Table 5.4. The Annual Summary Waste
Flow Table is shown in Appendix
5.1.
Table 5.4 Summary of
Quantities of Waste Material (November 2022 to October 2023)
|
Waste Type |
Quantity for reporting period |
Cumulative Quantity-to-Date |
|
Hard Rock and Large Broken Concrete (Inert) (in ‘000m3) |
0 |
0 |
|
Reused in this Contract (Inert) (in ‘000m3) |
0 |
0 |
|
Reused in other Projects (Inert) (in ‘000m3) |
0 |
0 |
|
Disposal as Public Fill (Inert) (in ‘000m3) |
5.22 |
13.78 |
|
Metals (in ‘000kg) |
5.95 |
7.52 |
|
Paper / Cardboard Packing (in ‘000kg) |
0.29 |
0.52 |
|
Plastics (in ‘000kg) |
0.04 |
0.058 |
|
Chemical Wastes (in ‘000kg) |
0 |
0 |
|
General Refuses (in ‘000kg) |
149.45 |
538.58 |
|
Remark: Summary of waste
disposal has been updated in this annual report. |
||
6.1.1
One environmental complaint regarding the water quality at Pui O Beach
was recorded in the reporting period. Upon investigation, the works activities
at Pui O Pumping Station (POPS) including land-based and marine based did not
result in any unacceptable environmental impacts to the surrounding environment
as reviewed with the relevant works activities and environmental requirements
for the Project, and it was considered as non-project related..
Table 6.1 Summary of
Complaints in the Reporting Period
|
Date
of Notification from EPD |
Date
of Complaint |
Description
of Complaint |
Validity
of Complaint |
Close-Out
Date / Status |
|
23 Dec 2022 |
21 Dec 2022 |
A complaint is regarding to the water quality for Pui O Beach, Lantau
Island. |
Based on the investigation, the works activities at POPS did not
result in any water quality impacts to the Pui O Beach. |
The interim report was submitted to EPD on 4 Jan 2023. |
6.1.2
No notification of summons and successful prosecution regarding
construction works were recorded in the reporting period.
6.1.3
Cumulative statistic on complaints and successful prosecutions are
summarized in Table 6.2 and Table 6.3 respectively.
Table 6.2 Cumulative
Statistics on Complaints
|
Reporting
Period |
No.
of Complaints |
|
November
2022 - October 2023 |
1 |
|
Project
commencement to the end of last reporting period |
2 |
|
Total |
2 |
Table 6.3 Cumulative
Statistics on Successful Prosecutions
|
Environmental
Parameters |
Cumulative
No. Brought Forward |
No.
of Successful Prosecutions this month (Offence Date) |
Cumulative
No. Project-to-Date |
|
Air |
- |
0 |
0 |
|
Noise |
- |
0 |
0 |
|
Water |
- |
0 |
0 |
|
Waste |
- |
0 |
0 |
|
Other |
- |
0 |
0 |
|
Total |
- |
0 |
0 |
7.1.1
The environmental mitigation measures that recommended in the
Implementation Status of Recommended Mitigation Measure in the Project EM&A
Manual covered the issues of Air Quality, Noise, Water Quality, Ecological
Impact, Waste Management Implication, Landscape & Visual and Cultural
Heritage and presented in Appendix
7.1.
7.1.2
The recommended mitigation measures for the reporting period are listed
below:
·
Proper water pollution control measures to be taken to prevent untreated
effluent discharge from site work
·
Vehicle wheel-washing and body washing facilities should be provided at
the site entrance;Adopt temporary drainage and sediment control facilities on
Site;
·
Adopt surface
drainage and sediment control facilities for sewage installation in village and
public roads
·
Silt curtains should be installed to surround the marine dredging area
in accordance with Silt Curtain Deployment Plan.
·
Dust control during dust generating works;
·
Implementation of noise pollution control in accordance with
Construction Noise Mitigation Plan;
·
Tree protection works within the Project Site;
·
Proper waste handling, recycling and storage;
·
Ensure the transplanting of the trees including Aquilaris sinensis and their establishment are not affected by any
unacceptable construction works;
·
Adopt surface drainage and sediment control facilities for sewage
installation in village and public roads;
·
Provide caring measures for the health, form and structural conditions
for transplant trees including Aquilaris
sinensis in holding nursery;
·
Fully implement tree preservation works on site and holding nursery to
ensure compliance of relevant legislation and guidelines stated in EM&A
Manual.
·
Implementation of noise pollution control including use of QPME in
accordance with Construction Noise Mitigation Plan;
·
Regular water spraying on drilling, exposed area and excavation works
for dust control;
·
To inspect the condition of silt curtains on regular basis, and after
adverse weather including any rainstorms and typhoons in wet season.
The implemented mitigation
measures are considered effective.
8.1.1
Noise monitoring was conducted at eight (8) noise monitoring stations
(N12a, N12b, N13, N14, N15b, N16a, N16b and N17) once per week in the reporting
period.
8.1.2
No action or limit level exceedance was recorded in construction noise
level in this present period.
8.2.1
Marine-based construction works has been commenced since 19 April 2022,
marine water monitoring was initialised since 12 April 2022.
8.2.2
Water quality monitoring (WQM) on 1, 3 and 5 Nov 2022, 16 and 28 Jan
2023, 22 and 27 Feb 2023, 27 Mar 2023, 22 Apr, 17 Jul 2023, 1 and 8 Sep 2023,
7, 9 and 18 Oct 2023 were cancelled due to adverse weather.
8.2.3
In accordance with the action level and limit level in Baseline
Monitoring Report Rev. 9.2 agreed by EPD on 2 September 2022, 6 action level
exceedances on turbidity, 16 action level exceedances on SS were recorded in
the reporting period of 1 November 2022 to 31 October 2023.
8.3.1
Transplanting works for plant species, Aquilaris sinensis, was completed on 26 April 2022. Maintenance
works for trees in holding nursery have commenced.
8.3.2
Monitoring of maintenance works for the transplanted plant species was
conducted at the holding nursery while in the reporting period.
8.3.3
As per latest version of PTP, four tree found (1 no. of Aquilaria sinensis and 3 nos. of Gmelina chinensis) within the site of
SSWSTW which are considered to be the plant species with conservative
importance for temporarily transplanted to the nursery at Kam Tin and
eventually be transplanted to Pui O Pumping Station.
8.3.4
The retained tree (T035) Dalbergia
assamica (南嶺黃檀) located within the site boundary of
the Construction of San Shek Wan Sewage Treatment Works was collapsed on 2 Sep
2023 afternoon after typhoon “Saola” (Signal No. 10). No injury and significant
damage were caused in the tree collapse incident. Incident report for this case
was provided by the Contractor on 11 October 2023. To minimize obstruction to
the public, the collapsed tree has been removed and delivered to Y Park.
8.4.1
No environmental non-compliance was recorded in present period.
8.5.1 There was no particular action taken
since no non-compliance was recorded in present period.